5 Fall Arrest Systems For Lewisham Council
Posted On: 02 June 2008Client: Lewisham Town Council
Main Contractor: Melray
Project Type: Installation of 5 separation fall protection systems
Our Role:
This again required a rapid response to the safety problem. During a refurbishment is become apparent that there was no safety systems for the roof gantries and contractors were required to access areas to the roof for cleaning and maintenance requirements.
After a site survey it was confirmed that 5 separate systems were required to be installed within the concrete walls. Pristine worked through the night to reduce any disruption to the client. The project was completed on time with minimum disruption.