Pristine Win Large Abseiling Tracks Project
Posted On: 23 September 2008Client: MTV Studies, UK House
Main Contractor: Osprey Contracts
Project Type: Installation of 2 abseiling tracks, plus 2 fall arrest ladders
Our Role:
With a wide range of experience working in heights safety solutions and fall protection systems, Pristine assisted throughout the project lifecycle of the client’s requirements. From the initial enquiry, Pristine surveyed the site, worked with the client and confirmed all the fixing positions, undertook the load calculations, worked through the night and installed the first phase within a 2 week period.
Pristine installed a unique smooth aluminium rail system, which is excellent for easy movement along the building face. The track is easy to use and operate for rope access specialist with added suspension points and breaks to enable the operative to effectively position themselves.
We installed a face mounted system that was fixed back through the curtain walling and fixed back to the main structural elements of the building.